MINOS CSP Tower Plant

ESE has been awarded Owner’s Engineering Services for EPC Contractor selection by NUR Energie, for the MINOS CSP Plant. The MINOS Plant will be located in Crete, Greece and will produce 50 MWe based on tower technology and using a storage system with molten salt as heat storage fluid. The award of such contract is a source of great satisfaction and puts once again ESE among the top worldwide consulting companies in the field of Concentrated Solar Power.

Share on:

[sharethis-inline-buttons]

No Comments

Sorry, the comment form is closed at this time.