450 MW ISO Combined Cycle Basic Design

ESE has been awarded the basic design of a 450MW ISO Combined Cycle located in Middle-East. The power plant will produce 450 MW of electricity with 1 Gas Turbine and 1 Steam Turbine. ESE will complete the basic engineering phase of the project and will review the detailed engineering phase carried out by another company.

Share on:

[sharethis-inline-buttons]

No Comments

Sorry, the comment form is closed at this time.