Feb 2021 Commissioning and Performance Test for Alon Tavor and Ramat Gabriel
ESE as Owner’s Engineer has given on-site support to Rapaci Energy team for the commissioning and performance test phases for Alon Tavor and Ramat Gabriel Co-Generation Power Plants (73 MWe + 40 tons/h steam each).
The successful operation of both plants is of primary importance for ESE that has been following both projects during the conception, design, and construction stages.
The collaboration with Rapaci is now continuing with the development of a prediction model for the plants performances as function of ambient conditions and exported steam.
Share on:
[sharethis-inline-buttons]
Sorry, the comment form is closed at this time.